Frameworks and control maps
Every control, mapped honestly.
Each framework in Toevan’s catalog, control by control: where Toevan gives code evidence on every pull request, where it gives process evidence from every merge, and what is still planned.
121 controls in Toevan’s scope across 7 catalog editions · live and planned, never blurred
Code evidence
47controls across 7 frameworks, checked on every pull requestLive (process)
10from merges, approvals, required checks, rule changes, and deployments and releases recorded by GitHubPlanned
64can be evidenced from code or GitHub; the rule is not built yetOrganisation-level controls
Policies, people, vendors, physical security and the like.Toevan gives supporting evidence for 10 of these.Managed by your organisation’s workflowsThe ledger
Every framework, at a glance.
One bar per framework, split by how Toevan gives evidence for each control in its scope.
| Framework | Control map | Code evidence | Live (process) | Planned | In scope |
|---|---|---|---|---|---|
| SOC 2 Trust Services Criteria (2017) | 6 | 1 | 8 | 15 | |
| ISO/IEC 27001 2022, Annex A | 9 | 6 | 11 | 26 | |
| PCI DSS v4.0 | 9 | 1 | 16 | 26 | |
| NIST 800-53 Moderate Rev 5, NIST SP 800-53B baseline | 12 | 2 | 23 | 37 | |
| HIPAA 45 CFR Part 164 | 7 | 0 | 1 | 8 | |
| GDPR Regulation (EU) 2016/679 | 3 | 0 | 0 | 3 | |
| DORA Regulation (EU) 2022/2554 | 1 | 0 | 5 | 6 |
Toevan gives evidence for controls; it never certifies them or claims a framework is covered. Whether the evidence is sufficient is your auditor’s judgement.
Counts as mapped in v1.4.1, from the product’s framework catalog and the requirement coverage of every shipped blueprint. Supporting controls stay with your organisation and are in no count. A control whose only evidence was withdrawn is shown as planned, or as the organisation’s when it cannot be checked in code.
Statuses
What each status means.
- Code evidenceSealed on every pull request. Always partial: the control also asks for things outside code.
- Live (process)Merged pull requests, approvals, required checks, branch protection, rulesets and bypasses, and deployments and releases recorded by GitHub, each sealed.
- SupportingToevan records related evidence, but the duty is organisational, so it never counts as covered.
- PlannedCan be evidenced from code or GitHub. The rule or mapping is not built yet.
Control maps
One map per framework, every control in it.
Controls are shown by id with Toevan’s own short names. The official titles and requirement text belong to each framework’s publisher.
SOC 2
Trust Services Criteria (2017)Code evidence for access, boundary and confidential-data criteria on every pull request, and process evidence for change approvals from every merge.
Code evidence · 6CC6.1CC6.3CC6.6CC6.7C1.1C1.2Live (process) · 1CC8.115 controls in Toevan’s scopeISO/IEC 27001
2022, Annex ACode evidence for Annex A controls from secrets handling to cryptography, and change, code-access and settings evidence from every merge.
Code evidence · 9A.5.15A.5.17A.8.2A.8.3A.8.8A.8.12A.8.20A.8.22A.8.24Live (process) · 6A.8.4A.8.9A.8.25A.8.29A.8.31A.8.3226 controls in Toevan’s scopePCI DSS
v4.0Code evidence for stored and transit card data, secrets, access and secure code, and change approval from every merge.
Code evidence · 9Req.1.3Req.3.3Req.3.5Req.3.6Req.4.2Req.6.3Req.7.2Req.7.3Req.8.6Live (process) · 1Req.6.526 controls in Toevan’s scopeNIST 800-53 Moderate
Rev 5, NIST SP 800-53B baselineCode evidence for controls from access enforcement to protection at rest, and configuration change control from every merge.
Code evidence · 12AC-2AC-3AC-4AC-6CM-2CM-6IA-5SA-11SC-7SC-8SC-28SI-2Live (process) · 2CM-3SA-1037 controls in Toevan’s scopeHIPAA
45 CFR Part 164Code evidence for the technical safeguards and the Privacy Rule’s use and disclosure requirements, where they live in code.
Code evidence · 7164.308(a)(4)164.312(a)(1)164.312(c)(1)164.312(d)164.312(e)(1)164.502164.514Live (process) · 0None mapped8 controls in Toevan’s scopeGDPR
Regulation (EU) 2016/679Code evidence for the processing principles, data protection by design and security of processing.
Code evidence · 3Art.5Art.25Art.32Live (process) · 0None mapped3 controls in Toevan’s scopeDORA
Regulation (EU) 2022/2554Code evidence for protection and prevention, and process evidence from deployments and releases for Article 9.
Code evidence · 1Art.9Live (process)Art.9from deployments and releases6 controls in Toevan’s scope- Another framework?NIS2, an internal control set or a sector standard: the evidence is the same, only the mapping changes.Ask for a mapping
Outside Toevan’s scope
Your organisation’s process.
Organisation-level controls (policies, people, vendors, physical security and the like) stay with your organisation’s own process; Toevan does not cover them.
Every report lists them, so a clean result is never read as more than it is. The kinds of duty they cover:
- Organisational policy
- Operational processes
- Physical security
- Contracts and vendors
- People and HR
- Regulatory procedure
- External assessment
Roadmap
On the roadmap, and labelled so.
Mappings proposed, not yet in the product catalog. Each needs a catalog edition and rule citations before the product shows it.
- DORA RTS on ICT risk managementPlannedDelegated Regulation (EU) 2024/1774 · Art. 17 ICT change management with process evidence; Art. 16 development and maintenance with code evidence.
- NIST SSDFPlannedSP 800-218 v1.1 · Secure development practices, from blueprints, reviews and dependency checks.
- SLSAPlannedv1 specification (OpenSSF) · Source track from protected branches and two-party review; build provenance from GitHub attestations is linked since v1.4.0 (Consumed).
- OWASP Top 10Planned2021 · Rules mapped to the categories that can be checked in code.
- EU Cyber Resilience ActPlannedRegulation (EU) 2024/2847 · Components, SBOM export and vulnerability handling.
SOC 2Trust Services Criteria (2017)
Organisational policyCC1.1 Conduct commitment · CC1.2 Board oversight · CC1.3 Reporting lines · CC2.1 Good control information · CC2.2 Staff duty briefings · CC2.3 Outside party talks · CC3.1 Risk goals · CC3.2 Risk weighing · CC3.3 Fraud risk review · CC3.4 Change impact review · CC5.1 Risk cutting controls · CC5.2 Technology control choices · CC5.3 Rolled out policies · CC9.1 Disruption risk reduction · P1.1 Privacy notice · P2.1 Consent choices · P3.1 Lawful collection · P3.2 Explicit sensitive consent · P4.1 Stated purpose limits · P6.1 Consent before sharing · P6.2 Sharing records · P6.3 Unauthorized sharing records
Operational processesCC4.1 Ongoing control reviews · CC4.2 Weakness reporting · CC6.8 Unwanted software blocking · CC7.3 Event judging · CC7.4 Incident response steps · CC7.5 Incident recovery learning · A1.1 Capacity watching · A1.3 Recovery testing · PI1.1 Defined processing goals · PI1.4 Output delivery review · PI1.5 Stored item integrity · P5.1 Access request answers · P5.2 Correction handling · P6.7 Sharing accounting · P7.1 Accurate personal data · P8.1 Complaint handling
Physical securityCC6.4 Physical entry limits · CC6.5 Asset data disposal
Contracts and vendorsCC9.2 Vendor risk management · P6.4 Vendor privacy commitments · P6.5 Vendor incident reporting
People and HRCC1.4 Capable staff hiring · CC1.5 Duty answerability
Regulatory procedureP6.6 Breach notices
ISO/IEC 270012022, Annex A
Toevan gives supporting evidence for 2 of these.
Organisational policyA.5.1 Written policy set · A.5.2 Security role owners · A.5.4 Leadership backing · A.5.5 Authority contacts · A.5.6 Expert group contacts · A.5.8 Project security steps · A.5.9 Owned asset list · A.5.10 Asset use rules · A.5.11 Assets handed back · A.5.12 Sensitivity sorting · A.5.13 Sensitivity marking · A.5.14 Data transfer rules · A.5.23 Cloud use rules · A.5.37 Written operating steps · A.6.7 Remote work safeguards
Operational processesA.5.7 Attacker news tracking · A.5.24 Incident readiness · A.5.25 Event severity sorting · A.5.26 Incident response steps · A.5.27 Incident learning · A.5.28 Incident evidence collection · A.5.29 Outage security plans · A.5.30 Recovery readiness · A.6.8 Staff problem reporting · A.8.1 User device protection · A.8.6 Capacity planning · A.8.7 Malware defense · A.8.14 Spare capacity · A.8.16 Unusual behavior watching · A.8.17 Clock matching · A.8.18 Utility program limits · A.8.19 Live software approval · A.8.21 Network service rules · A.8.23 Web traffic filtering
Physical securityA.7.1 Secure site boundaries · A.7.2 Site entry controls · A.7.3 Locked rooms · A.7.4 Premises watching · A.7.5 Fire flood protection · A.7.6 Secure area rules · A.7.7 Tidy desks · A.7.8 Equipment siting · A.7.9 Away asset safeguards · A.7.10 Disk drive care · A.7.11 Power failure backup · A.7.12 Cabling protection · A.7.13 Equipment servicing · A.7.14 Safe equipment wiping
Contracts and vendorsA.5.19 Vendor security demands · A.5.20 Vendor agreement clauses · A.5.21 Supply chain controls · A.5.22 Vendor service review · A.8.30 Outside developer oversight
People and HRA.6.1 Hiring background screening · A.6.2 Written security duties · A.6.3 Security awareness training · A.6.4 Rule breaking consequences · A.6.5 Duties after leaving · A.6.6 Promises about secrets
Regulatory procedureA.5.31 Legal duty tracking · A.5.32 Software rights records · A.5.33 Records safekeeping · A.5.34 Privacy duties
External assessmentA.5.35 Independent review · A.5.36 Policy compliance review · A.8.34 Audit safeguards
PCI DSSv4.0
Organisational policyReq.1.1 Network policy record · Req.1.5 Endpoint bridging policy · Req.2.1 Hardening policy record · Req.3.1 Data protection policy · Req.4.1 Transit policy record · Req.5.1 Malware policy record · Req.6.1 Development policy record · Req.7.1 Access policy record · Req.8.1 Sign in policy · Req.9.1 Physical policy record · Req.10.1 Logging policy record · Req.11.1 Testing policy record · Req.12.1 Security policy program · Req.12.2 Acceptable use rules · Req.12.3 Targeted risk review · Req.12.4 Compliance oversight · Req.12.5 Scope definition record
Operational processesReq.2.3 Wireless review · Req.3.7 Key lifecycle process · Req.5.2 Endpoint malware defense · Req.5.3 Malware update monitoring · Req.5.4 Phishing defenses · Req.10.4 Routine log review · Req.10.6 Clock synchronization · Req.10.7 Failure detection process · Req.11.2 Rogue wireless review · Req.11.5 Intrusion detection process · Req.12.10 Incident response plan
Physical securityReq.9.2 Facility entry controls · Req.9.3 Visitor access records · Req.9.4 Media handling rules · Req.9.5 Terminal tamper review
Contracts and vendorsReq.12.8 Provider contracts · Req.12.9 Provider support duties
People and HRReq.12.6 Awareness training · Req.12.7 Staff screening
External assessmentReq.11.4 Penetration testing
NIST 800-53 ModerateRev 5, NIST SP 800-53B baseline
Toevan gives supporting evidence for 4 of these.
Organisational policyAC-1 Policy and Procedures · AT-1 Policy and Procedures · AU-1 Policy and Procedures · CA-1 Policy and Procedures · CM-1 Policy and Procedures · CP-1 Policy and Procedures · IA-1 Policy and Procedures · IR-1 Policy and Procedures · MA-1 Policy and Procedures · MP-1 Policy and Procedures · PE-1 Policy and Procedures · PL-1 Policy and Procedures · PL-2 System Security and Privacy Plans · PL-4 Rules of Behavior · PL-8 Security and Privacy Architectures · PL-10 Baseline Selection · PL-11 Baseline Tailoring · PS-1 Policy and Procedures · RA-1 Policy and Procedures · RA-2 Security Categorization · RA-3 Risk Assessment · RA-7 Risk Response · RA-9 Criticality Analysis · SA-1 Policy and Procedures · SA-2 Allocation of Resources · SA-3 System Development Life Cycle · SA-5 System Documentation · SA-8 Security and Privacy Engineering Principles · SA-15 Development Process, Standards, and Tools · SA-22 Unsupported System Components · SC-1 Policy and Procedures · SI-1 Policy and Procedures · SR-1 Policy and Procedures
Operational processesAC-8 System Use Notification · AC-14 Permitted Actions Without Identification or Authentication · AC-18 Wireless Access · AC-19 Access Control for Mobile Devices · AC-20 Use of External Systems · AC-21 Information Sharing · AC-22 Publicly Accessible Content · AU-4 Audit Log Storage Capacity · AU-5 Response to Audit Logging Process Failures · AU-6 Audit Record Review, Analysis, and Reporting · AU-7 Audit Record Reduction and Report Generation · CM-4 Impact Analyses · CM-8 System Component Inventory · CM-9 Configuration Management Plan · CM-10 Software Usage Restrictions · CM-11 User-installed Software · CM-12 Information Location · CP-2 Contingency Plan · CP-3 Contingency Training · CP-4 Contingency Plan Testing · CP-6 Alternate Storage Site · CP-7 Alternate Processing Site · CP-8 Telecommunications Services · CP-10 System Recovery and Reconstitution · IA-3 Device Identification and Authentication · IA-7 Cryptographic Module Authentication · IA-11 Re-authentication · IA-12 Identity Proofing · IR-2 Incident Response Training · IR-3 Incident Response Testing · IR-4 Incident Handling · IR-5 Incident Monitoring · IR-6 Incident Reporting · IR-7 Incident Response Assistance · IR-8 Incident Response Plan · SC-2 Separation of System and User Functionality · SC-4 Information in Shared System Resources · SC-5 Denial-of-service Protection · SC-10 Network Disconnect · SC-15 Collaborative Computing Devices and Applications · SC-17 Public Key Infrastructure Certificates · SC-18 Mobile Code · SC-20 Secure Name/Address Resolution Service (Authoritative Source) · SC-21 Secure Name/Address Resolution Service (Recursive or Caching Resolver) · SC-22 Architecture and Provisioning for Name/Address Resolution Service · SC-39 Process Isolation · SI-3 Malicious Code Protection · SI-4 System Monitoring · SI-5 Security Alerts, Advisories, and Directives · SI-8 Spam Protection · SI-16 Memory Protection
Physical securityMA-2 Controlled Maintenance · MA-3 Maintenance Tools · MA-4 Nonlocal Maintenance · MA-5 Maintenance Personnel · MA-6 Timely Maintenance · MP-2 Media Access · MP-3 Media Marking · MP-4 Media Storage · MP-5 Media Transport · MP-6 Media Sanitization · MP-7 Media Use · PE-2 Physical Access Authorizations · PE-3 Physical Access Control · PE-4 Access Control for Transmission · PE-5 Access Control for Output Devices · PE-6 Monitoring Physical Access · PE-8 Visitor Access Records · PE-9 Power Equipment and Cabling · PE-10 Emergency Shutoff · PE-11 Emergency Power · PE-12 Emergency Lighting · PE-13 Fire Protection · PE-14 Environmental Controls · PE-15 Water Damage Protection · PE-16 Delivery and Removal · PE-17 Alternate Work Site
Contracts and vendorsSA-4 Acquisition Process · SA-9 External System Services · SR-2 Supply Chain Risk Management Plan · SR-3 Supply Chain Controls and Processes · SR-5 Acquisition Strategies, Tools, and Methods · SR-6 Supplier Assessments and Reviews · SR-8 Notification Agreements · SR-10 Inspection of Systems or Components · SR-12 Component Disposal
People and HRAT-2 Literacy Training and Awareness · AT-3 Role-based Training · AT-4 Training Records · PS-2 Position Risk Designation · PS-3 Personnel Screening · PS-4 Personnel Termination · PS-5 Personnel Transfer · PS-6 Access Agreements · PS-7 External Personnel Security · PS-8 Personnel Sanctions · PS-9 Position Descriptions
External assessmentCA-2 Control Assessments · CA-3 Information Exchange · CA-5 Plan of Action and Milestones · CA-6 Authorization · CA-7 Continuous Monitoring · CA-9 Internal System Connections
HIPAA45 CFR Part 164
Toevan gives supporting evidence for 2 of these.
Organisational policy164.308(a)(2) Assigned security responsibility · 164.310(b) Workstation use · 164.316(a) Policies and procedures · 164.316(b)(1) Documentation · 164.506 Uses and disclosures to carry out treatment, payment, or health care operations · 164.508 Uses and disclosures for which an authorization is required · 164.509 Uses and disclosures for which an attestation is required · 164.510 Uses and disclosures requiring an opportunity for the individual to agree or to object · 164.512 Uses and disclosures for which an authorization or opportunity to agree or object is not required · 164.520 Notice of privacy practices for protected health information · 164.522 Rights to request privacy protection for protected health information · 164.528 Accounting of disclosures of protected health information · 164.530 Administrative requirements
Operational processes164.308(a)(1) Security management process · 164.308(a)(6) Security incident procedures · 164.308(a)(7) Contingency plan · 164.524 Access of individuals to protected health information · 164.526 Amendment of protected health information
Physical security164.310(a)(1) Facility access controls · 164.310(c) Workstation security · 164.310(d)(1) Device and media controls
Contracts and vendors164.308(b)(1) Business associate contracts and other arrangements · 164.314(a)(1) Business associate contracts or other arrangements · 164.314(b)(1) Requirements for group health plans · 164.504 Uses and disclosures: Organizational requirements
People and HR164.308(a)(3) Workforce security · 164.308(a)(5) Security awareness and training
Regulatory procedure164.404 Notification to individuals · 164.406 Notification to the media · 164.408 Notification to the Secretary · 164.410 Notification by a business associate · 164.412 Law enforcement delay · 164.414 Administrative requirements and burden of proof
External assessment164.308(a)(8) Evaluation
GDPRRegulation (EU) 2016/679
Toevan gives supporting evidence for 1 of these.
Organisational policyArt.6 Lawfulness of processing · Art.7 Conditions for consent · Art.8 Conditions applicable to child's consent in relation to information society services · Art.9 Processing of special categories of personal data · Art.10 Processing of personal data relating to criminal convictions and offences · Art.11 Processing which does not require identification · Art.24 Responsibility of the controller · Art.26 Joint controllers · Art.27 Representatives of controllers or processors not established in the Union · Art.29 Processing under the authority of the controller or processor · Art.30 Records of processing activities · Art.31 Cooperation with the supervisory authority · Art.35 Data protection impact assessment · Art.36 Prior consultation · Art.37 Designation of the data protection officer · Art.38 Position of the data protection officer · Art.39 Tasks of the data protection officer
Operational processesArt.12 Transparent information, communication and modalities for the exercise of the rights of the data subject · Art.13 Information to be provided where personal data are collected from the data subject · Art.14 Information to be provided where personal data have not been obtained from the data subject · Art.15 Right of access by the data subject · Art.16 Right to rectification · Art.17 Right to erasure (‘right to be forgotten’) · Art.18 Right to restriction of processing · Art.19 Notification obligation regarding rectification or erasure of personal data or restriction of processing · Art.20 Right to data portability · Art.21 Right to object · Art.22 Automated individual decision-making, including profiling
Contracts and vendorsArt.28 Processor
Regulatory procedureArt.33 Notification of a personal data breach to the supervisory authority · Art.34 Communication of a personal data breach to the data subject · Art.44 General principle for transfers · Art.45 Transfers on the basis of an adequacy decision · Art.46 Transfers subject to appropriate safeguards · Art.47 Binding corporate rules · Art.48 Transfers or disclosures not authorised by Union law · Art.49 Derogations for specific situations
DORARegulation (EU) 2022/2554
Toevan gives supporting evidence for 1 of these.
Organisational policyArt.5 Governance and organisation · Art.6 ICT risk management framework · Art.16 Simplified ICT risk management framework · Art.24 General requirements for the performance of digital operational resilience testing · Art.28 General principles · Art.29 Preliminary assessment of ICT concentration risk at entity level
Operational processesArt.11 Response and recovery · Art.13 Learning and evolving · Art.14 Communication · Art.17 ICT-related incident management process · Art.18 Classification of ICT-related incidents and cyber threats
Contracts and vendorsArt.30 Key contractual provisions
Regulatory procedureArt.15 Further harmonisation of ICT risk management tools, methods, processes and policies · Art.19 Reporting of major ICT-related incidents and voluntary notification of significant cyber threats · Art.20 Harmonisation of reporting content and templates · Art.21 Centralisation of reporting of major ICT-related incidents · Art.22 Supervisory feedback · Art.23 Operational or security payment-related incidents concerning credit institutions, payment institutions, account information service providers, and electronic money institutions · Art.45 Information-sharing arrangements on cyber threat information and intelligence
External assessmentArt.26 Advanced testing of ICT tools, systems and processes based on TLPT · Art.27 Requirements for testers for the carrying out of TLPT
Test the mapping on a real audit.
Bring one repository and an upcoming audit. We’ll set up the blueprint and walk your auditor through verification.
- One repository, one framework
- Evidence from the first pull request
- Verifiable without a Toevan account